⚡ Energy-101: Hydroelectric Power Plants

USACE EM 1110-2-3006 (Pages 1-75) | 30 Questions | 21/30 to Pass (3 PDH)

Question 1 of 30

1. Primary purpose of electrical design (Ch 1-1)?

2. Unit switching arrangement advantage (Ch 2-1)?

3. Generator voltage limit slow-speed (Ch 3-2)?

4. GSU transformer impedance tolerance (Ch 4-2)?

5. Generator neutral grounding preference (Ch 3-5)?

6. Transformer cooling designation (Ch 4-3)?

7. Switchyard minimum voltage (Ch 5-1)?

8. Surge arrester location (Ch 5-3)?

9. Short-circuit ratio benefit (Ch 3-3)?

10. 3-winding transformer advantage (Ch 2-3)?

11. Insulation class temperature rise (Ch 3-4)?

12. Excitation system type preferred (Ch 3-6)?

13. Generator capacity basis (Ch 3-1)?

14. Power factor rating typical (Ch 3-2)?

15. Transformer tap range (Ch 4-2)?

16. Bushings minimum voltage class (Ch 4-4)?

17. Oil preservation system (Ch 4-3)?

18. Station service voltage preferred (Ch 6-1)?

19. Circuit breaker rating basis (Ch 5-2)?

20. Disconnect switch purpose (Ch 5-4)?

21. Grounding transformer connection (Ch 6-3)?

22. Surge arrester MCOV selection (Ch 5-3)?

23. Station service transformer source (Ch 6-1)?

24. Bus differential protection (Ch 5-2)?

25. Generator capability curve limit (Ch 3-3)?

26. CT ratio selection basis (Ch 5-2)?

27. Breaker failure scheme required (Ch 5-2)?

28. Exciter response time (Ch 3-6)?

29. Transformer sound level limit (Ch 4-3)?

30. Protective relaying philosophy (Ch 5-1)?