⚡ Energy-101: Hydroelectric Power Plants
USACE EM 1110-2-3006 (Pages 1-75)
| 30 Questions | 21/30 to Pass (3 PDH)
Question
1
of 30
1. Primary purpose of electrical design (Ch 1-1)?
A) Minimize construction cost
B) Reliable power delivery with min outage risk
C) Maximize transmission voltage
D) Standardize equipment
2. Unit switching arrangement advantage (Ch 2-1)?
A) Minimum generation loss from faults
B) Lowest initial cost
C) Simplest maintenance
D) Maximum redundancy
3. Generator voltage limit slow-speed (Ch 3-2)?
A) ≤13.8 kV
B) ≤22 kV
C) ≤69 kV
D) Unlimited
4. GSU transformer impedance tolerance (Ch 4-2)?
A) 7.5%
B) 5%
C) 10%
D) 12.5%
5. Generator neutral grounding preference (Ch 3-5)?
A) Low impedance
B) High impedance
C) Solidly grounded
D) Ungrounded
6. Transformer cooling designation (Ch 4-3)?
A) ONAN/ONAF
B) ONAF/ONAF
C) OFAF
D) ANAN
7. Switchyard minimum voltage (Ch 5-1)?
A) 69 kV
B) 13.8 kV
C) 34.5 kV
D) 230 kV
8. Surge arrester location (Ch 5-3)?
A) Transformer entrance bushings
B) Generator terminals
C) Switchgear only
D) Bus section
9. Short-circuit ratio benefit (Ch 3-3)?
A) Better stability
B) Higher efficiency
C) Lower cost
D) Smaller size
10. 3-winding transformer advantage (Ch 2-3)?
A) Low through fault impedance
B) Unit isolation
C) Highest reliability
D) Lowest cost
11. Insulation class temperature rise (Ch 3-4)?
A) Class B/F: 75°C/90°C
B) Class F: 115°C
C) Class H: 150°C
D) Class A: 50°C
12. Excitation system type preferred (Ch 3-6)?
A) Static excitation
B) Rotating exciter
C) Brushless
D) DC separate
13. Generator capacity basis (Ch 3-1)?
A) Nameplate rating
B) Max turbine HP at 100% gate
C) Peak load demand
D) Average flow
14. Power factor rating typical (Ch 3-2)?
A) 0.9 lagging
B) 0.8 leading
C) Unity
D) 0.95 leading
15. Transformer tap range (Ch 4-2)?
A) ±10% in ⅝% steps
B) ±5% fixed
C) ±15% continuous
D) No taps needed
16. Bushings minimum voltage class (Ch 4-4)?
A) Next higher standard
B) Exact match
C) Two classes higher
D) Porcelain only
17. Oil preservation system (Ch 4-3)?
A) Conservator with diaphragm
B) Nitrogen blanket
C) Open breather
D) Sealed tank
18. Station service voltage preferred (Ch 6-1)?
A) 4.16 kV
B) 13.8 kV
C) 480 V
D) 2.4 kV
19. Circuit breaker rating basis (Ch 5-2)?
A) Max fault current
B) Continuous current
C) Momentary only
D) Generator MVA
20. Disconnect switch purpose (Ch 5-4)?
A) Visible isolation
B) Fault interruption
C) Load switching
D) Grounding only
21. Grounding transformer connection (Ch 6-3)?
A) Zig-zag wye
B) Delta-wye
C) Wye-wye
D) Open delta
22. Surge arrester MCOV selection (Ch 5-3)?
A) 1.05 × Max line-ground voltage
B) Exact L-G voltage
C) 1.25 × L-L voltage
D) System BIL rating
23. Station service transformer source (Ch 6-1)?
A) Unit auxiliary transformer
B) GSU tertiary
C) Off-site utility
D) Generator terminals
24. Bus differential protection (Ch 5-2)?
A) Required for all switchyards
B) Generator only
C) Optional
D) Transformer only
25. Generator capability curve limit (Ch 3-3)?
A) Rotor current & field heating
B) Stator heating only
C) Turbine HP only
D) Voltage regulation
26. CT ratio selection basis (Ch 5-2)?
A) Max fault current
B) Load current
C) Relay burden
D) Metering accuracy
27. Breaker failure scheme required (Ch 5-2)?
A) Multiple transmission circuits
B) Single circuit only
C) Generator bus only
D) Station service
28. Exciter response time (Ch 3-6)?
A) <10 seconds to 95% ceiling
B) <30 seconds
C) <5 seconds
D) Continuous
29. Transformer sound level limit (Ch 4-3)?
A) 65 dBA at 100 ft
B) 75 dBA
C) 55 dBA
D) No limit
30. Protective relaying philosophy (Ch 5-1)?
A) Minimum clearing time
B) Selectivity + dependability
C) Speed only
D) Cost minimization